S/4HANA programme delivery at Calderwood Industries
Client · Calderwood Industries
- 14Countries live
- 0Critical incidents post go-live
- On planProgramme tolerance
Delivered a global S/4HANA programme across 14 countries with full BTP-led integration and zero post-go-live critical incidents.
Practices engaged on this program
What we built it with
- Core
- Integration
- Extensibility
- Programme Tooling
What changed for the business
Live across 14 countries on plan
Wave plan honoured original critical path; no country slipped its committed go-live window.
Zero critical incidents post go-live
Hypercare exited cleanly; no Severity-1 incidents raised against the new core during the stabilisation window.
Process variants reduced from 1,400 to 180
Global process design discipline replaced accumulated local variation with a defensible, auditable core.
Month-end close compressed by 41%
Group close moved from 11 to 6.5 working days through redesigned intercompany, FX and reconciliation flows.